Jump to content



UAlbany Athletics- America East-
SOCIAL MEDIA: UAlbany Facebook- UAlbany Instagram- UAlbany Twitter- UAlbany Blog-
MEDIA: Albany Student Press- America East TV- ESPN3- Schenectady Gazette- The Team 104.5 ESPN Radio- The Team 104.5 ESPN Radio Archive interviews- Times Union College Sports- Times Union Sports- WCDB- WOFX 980-
FALL SPORTS LINKS: CAA Football-
WINTER SPORTS LINKS: College Insider- Pomeroy Ratings- Real TimeRPI-
SPRING SPORTS LINKS: Inside Lacrosse- Lax Power Backup Stick-
OTHER FORUMS: America East Forum- Any Given Saturday Forum- Championship Subdivision forum(1-AA Discussion) The Hen House - Siena Forum- Stony Brook Forum- Vermont Forum

MBB 2021-22 Preseason - News/Articles/Predictions/Chatter


Recommended Posts

11 hours ago, Eli said:

Did I hear DK say during the halftime chat with Wyland that the BPG is 12/11 vs Columbia? Isn't BPG almost ALWAYS against Vermont or another top AE team in conference play?

What the BLANK!!!  I have never known the BPG not being in early February.... may be just a statement error or confusion over what Roger was asking .... against Columbia .... during finals...no

Link to comment
Share on other sites

19 minutes ago, alum73 said:

The renovation of the PE building will prevent the feast associated with BPG, so it was moved up.

Interesting. Thank you Alum!

But curious, how exactly does it impact it?

Link to comment
Share on other sites

15 hours ago, alum73 said:

The renovation of the PE building will prevent the feast associated with BPG, so it was moved up.

Interesting that something is happening with the renovation program. I recall {probably incorrectly} that it was suppose to be completed by NOW???????

Anyone remember or know what else is ON the renovation program and TIME LINE?????

Link to comment
Share on other sites

Featured Projects 5/26/21

PE building starts page 125 - gym renovation to be finished next summer, pool fill-in in 2023

Athletics Complex pages 152-165

SEFCU

 Enhancements and amenities to greatly improve fan experience
 Rotates court to allow for more arena-like bowl seating
 Various seating options - from bleacher seating to high-end plush seating
 Increases ADA seating availability
 Combination of both fixed and retractable seating to continue to allow for increased floor area for non-gameday activities.
 Current budget estimate is $7.5M but will increase due to new change requests.
 Construction starts still undetermined but anticipate at least 12-month project duration.

AIR STRUCTURE

• Size based on current installation at Utica College (roughly 136,000sf, 4x bigger than former bubble structure)
• Cost estimated at $4-6M depending on amenities
• Would house synthetic turf field (80% reg football field), NCAA-compliant indoor track, other amenities as space allows
• Small ancillary building structure may be included (budget dependent) to house lockers, showers, coaching offices, etc.

SEFCU CORE

 Further design paused at start of CDs until funding becomes available. No further timeline available at this point.
 Estimated construction value to date about $12.5M.
 Design likely to change somewhat pending anticipated changes to Arena and planned changes to PE Phase02.

FOOTBALL BUILDING

 ~25,000 SF
 Includes:
 Football Offices
 Football Locker rooms
 Strength & Conditioning
Schedule: > 10 + Years

 

 

  • Thanks 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

×
×
  • Create New...